FacebookInstagramTwitterContact

 

Audience Ceremony           >>           First Meeting Of Royal Birthday Celebration National Committee           >>           Man United Edge Arsenal In Alexis Sanchez, Henrikh Mkhitaryan Swap           >>           Barcelona's Second-Half Surges A Key To Their Success This Season           >>           Real's Big Win Buys Zidane Time, Martial's Future, PSG Rocked By Lyon           >>           Chelsea And Sergio Aguero Among Those Rising Above Transfer Tension           >>           Camps Ready But Bangladesh Delays Repatriation Of Refugees           >>           Alert Level 4 Raised After Mayon Eruption           >>           Indonesia Seeks Immediate Return Of Two Fishermen Released By Abu Sayyaf           >>           Budget Is More Than Giving ‘Goodies’, Raising Taxes: Heng Swee Keat            >>          

 

SHARE THIS ARTICLE




REACH US


GENERAL INQUIRY

admin@brudirect.com

 

ADVERTISING

marketing@brudirect.com

 

PRESS RELEASE

pr@brudirect.com

 

HOTLINE

+673 222-0178 [Office Hour]

+673 223-6740 [Fax]

 



Upcoming Events


The Incredibles 5Km Fun Run
January 7th, 2018 | 00:00 AM


KIDS PANCAKE MAKING & DECORATING CLASS
January 21st, 2018 | 14:00 PM


THE 1 NATION FREE WORKOUT
January 21st, 2018 | 17:00 PM


20th Consumer Fair
January 24th, 2018 | 00:00 AM


Mazalina Wedding Expo
January 26th, 2018 | 00:00 AM





Prayer Times


The prayer times for Brunei-Muara and Temburong districts. For Tutong add 1 minute and for Belait add 3 minutes.


Imsak

: 05:04AM

Subuh

: 05:14AM

Syuruk

: 06:35AM

Doha

: 06:59AM

Zohor

: 12:33PM

Asar

: 03:54PM

Maghrib

: 06:28PM

Isyak

: 07:41PM

 



The Business Directory


 

 



Laos


  Home > Laos


Vientiane-Vangvieng Highway, New Face Of Transport System In Laos


 


 January 4th, 2018  |  10:26 AM  |   1219 views

VIENTIANE

 

(KPL) The Vientiane-Vangvieng highway will be part of the mega Laos-China Highway Project which will stretch between Vientiane and Boten in Luang Namtha where the Laos-China border is located.

 

The Vientiane-Vangvieng highway will stretch 113.5 km between Vientiane and Vangvieng district, Vientiane Province. 

 

It is designed to be 23 m wide with 4 lanes, two incoming and outgoing. At a cost of around US$ 1.3 billion, the highway will be built between Sikeuth in Naxaythong district in Vientiane and eastern Vangvieng from which the next phase of the Laos-China highway project will be connected.

 

The highway will run in parallel with existing Road 13 North through Naxon, Boua, Saka, Phonhong, Nongkhay, Phoupha, Hinheub, Vangkhi, Thaheua villages.

 

The road is designed to withstand a max speed of 80 km per hour. Seven roundabouts will be built along the highway along with two service areas and two rest areas. The service facilities will be equipped with gas stations, hotels, shops, restaurants and garages.

 

The project will be conducted as a Build-Operate-Transfer (BOT) project by Yunnan Construction Engineering Group. The construction of the highway was originally scheduled to take place in November 2017 and be completed in 2020.

 


 

Source:
courtesy of KPL NEWS AGENCY

by KPL News

 

If you have any stories or news that you would like to share with the global online community, please feel free to share it with us by contacting us directly at pr@brudirect.com

 

Related News


2,800 Cabbies Have Joined Grab, Uber

 2018-01-23 09:53:14

Hong Kong Bookseller Seized From China Train

 2018-01-23 10:25:15

Asia Wakes to Trump's Big Trade Move With Tariffs Aimed at Them

 2018-01-23 11:12:38