FacebookInstagramTwitterContact

 

Berkenan Menerima Mengadap Ketua Perwakilan Asing           >>           Doa Kesyukuran Istiadat Bersiram Sempurna Diadakan           >>           Bruipo Adakan Perbincangan Raikan WIPD 2018           >>           Memperkasa Kefahaman Akidah Umat Islam           >>           BST Ucap Selamat Tinggal Kepada S.S Bebatik           >>           Pameran 'Explore Brunei In Media Perspective' Dilancarkan           >>           Aplikasi Media Sosial Platform Pasarkan Produk Perniagaan           >>           Sembahyang Lima Waktu Mengangkat Darjat Manusia           >>           Farewell Calls           >>           Doa Selamat And Doa Kesyukuran For Istiadat Bersiram           >>          

 

SHARE THIS ARTICLE




REACH US


GENERAL INQUIRY

admin@brudirect.com

 

ADVERTISING

marketing@brudirect.com

 

PRESS RELEASE

pr@brudirect.com

 

HOTLINE

+673 222-0178 [Office Hour]

+673 223-6740 [Fax]

 



Upcoming Events


Outdoor Strobe Photography
April 28th, 2018 | 00:00 AM


Historic Talk: Postal Service In Brunei Darussalam And Its Development
April 28th, 2018 | 00:00 AM


Beautiful Afternoon Tea Buffet With Wardah (Inspiring Muslimah Modesty)
April 29th, 2018 | 00:00 AM


Visit From Bridged 'National Volunteer Service' To Malaysian Science University
April 30th, 2018 | 00:00 AM





Prayer Times


The prayer times for Brunei-Muara and Temburong districts. For Tutong add 1 minute and for Belait add 3 minutes.


Imsak

: 04:40AM

Subuh

: 04:50AM

Syuruk

: 06:10AM

Doha

: 06:33AM

Zohor

: 12:19PM

Asar

: 03:34PM

Maghrib

: 06:26PM

Isyak

: 07:38PM

 



The Business Directory


 

 



Laos


  Home > Laos


Vientiane-Vangvieng Highway, New Face Of Transport System In Laos


 


 January 4th, 2018  |  10:26 AM  |   2538 views

VIENTIANE

 

(KPL) The Vientiane-Vangvieng highway will be part of the mega Laos-China Highway Project which will stretch between Vientiane and Boten in Luang Namtha where the Laos-China border is located.

 

The Vientiane-Vangvieng highway will stretch 113.5 km between Vientiane and Vangvieng district, Vientiane Province. 

 

It is designed to be 23 m wide with 4 lanes, two incoming and outgoing. At a cost of around US$ 1.3 billion, the highway will be built between Sikeuth in Naxaythong district in Vientiane and eastern Vangvieng from which the next phase of the Laos-China highway project will be connected.

 

The highway will run in parallel with existing Road 13 North through Naxon, Boua, Saka, Phonhong, Nongkhay, Phoupha, Hinheub, Vangkhi, Thaheua villages.

 

The road is designed to withstand a max speed of 80 km per hour. Seven roundabouts will be built along the highway along with two service areas and two rest areas. The service facilities will be equipped with gas stations, hotels, shops, restaurants and garages.

 

The project will be conducted as a Build-Operate-Transfer (BOT) project by Yunnan Construction Engineering Group. The construction of the highway was originally scheduled to take place in November 2017 and be completed in 2020.

 


 

Source:
courtesy of KPL NEWS AGENCY

by KPL News

 

If you have any stories or news that you would like to share with the global online community, please feel free to share it with us by contacting us directly at pr@brudirect.com

 

Related News


Fleeing Snatch Thieves Arrested After Crashing Into Vehicle

 2018-04-27 09:32:09

India China: Why is Modi meeting Xi now?

 2018-04-27 09:45:59

Malaysia's Prime Minister Says Markets to Decide on Currency

 2018-04-27 10:23:12